skip to navigation
610.521.3300

Temple University HospitalJeanes Campus Cath Lab 1 Replacement & Renovation

Description

This project included the replacement of the existing diagnostic imaging equipment with the advanced Phillips Azurion 7 C 20 system, along with essential modifications for enhanced functionality. Key updates featured new finishes, a modern ceiling system, and overhead structural support for the new equipment. We improved patient flow with three new door sets in the east-west passages and added two new ambulatory entrances in the Patient Prep/Recovery area. The existing On-Call Room has been redefined as Equipment Area 227, expanding the Patient Prep/Recovery footprint while seamlessly integrating utility services. Our dedicated team ensured a smooth execution of this project, enhancing the clinical environment for optimal patient care.

  • Location

    Philadelphia, PA

  • Size

    1,100 SF

  • Schedule

    4 Months

  • Project Type

    Healthcare

Incidents in 365 days = 0

Safety Experience Modification Rating 0.759