Description

Complete renovation including removing over half of the exterior façade and existing structure to make the building 6’ wider and 3’ longer. The remaining front section of the historic building was stripped down to the exterior wall. All the mechanical and electric is 100% new. The front section was left intact and will be completely refurbished. Some challengers that we will face during the building process are supporting the front section to remain during demolition of the reaming section. We built a steel frame inside the building section to remain before we started demolition. It was made of 12’’ steel beams. The steam station for the adjacent property (President’s house) is located in our building. The system must stay in 100% operation throughout out construction. The pathway for the new electric and chilled water services runs through two adjacent properties. There are noise ordinances that we must follow. The project is LEED Silver which means all trash must be separated and sorted before leaving the property.

  • Use

    Guest and Meeting House for the President of UPenn

  • Location

    Philadelphia, PA

  • Size

    14,000 SF

  • Schedule

    18 months

  • Project Type

    Higher Education

Incidents in 365 days = 0

Safety Experience Modification Rating 0.755